Wednesday, October 28, 2020

So much for the schedule

 Well well. 

I planned to beaver away at my beautiful TKGA certification project and complete two sleeves this month. Then that designer bug I had caught got into my head. 

I designed a hat. I may rip apart the band and redo it as the cast off I chose is way too tight. But, the chart is done and instructions are written. I need to take a better picture, but here is an OK one:

Now, I'm working on a child sized pullover with a circular yoke. I want to sprinkle the decreases so that they don't line up. I was worrying about creating an impossibly complicated set of instructions as I worked through the sizes.

Last night my brain figured out how to work out the instructions. It was a blinding flash of the obvious. Turns out that if I choose increments of 18 for the yoke stitch count I can write all the decrease rows the same, adding one new row for each size. Gauge for this design is 5.25 sts/inch so adding 12 sts to the body increases the chest width about 2" which is about one size. 

 So, when I work out the same design for adults, I'll begin with the yoke and work back from there. 

I hope to finish my current design this week at which point I will go make my second sleeve. 

Wednesday, October 14, 2020

First Sleeve has some ends

I just now finished the knitting for the first sleeve of my TKGA final project. That puts me pretty close to the schedule I made up last week. I do have some ends to work in. 

Earlier today I loaded, unloaded and spread 600 pounds of compost/manure on part of my front yard. I had ground cover before Hurricane Harvey. When the backhoes came to pick up all the stuff that was removed from the house - furniture, doors, drywall, bedding, you know - your whole life on the curb - they scraped up the ground cover too. Two and a half years later it had refused to grow back, so I bought some top soil and planted more Asian jasmine. While it has not died, it has not flourished and I think there is something missing from the top soil. I put that same soil in some porch planters and am having trouble getting things to grow there as well. So, I held back two sacks of manure/compost for the planters and put the rest on the jasmine. We should have some rain later this week so it can start working it's organic magic and maybe in the spring that section of the yard will have recovered. 

In any event, I'm tuckered.

Tuesday, October 06, 2020

Design Fever

I apparently am quite thrilled about hacking the star stitch. It does not seem like much, but sometimes it seems miraculous. In any event, I'm designing a child's size sweater and beanie now. Yesterday, I went into a frenzy, thinking I could work it up for some random publication deadline. I thought it through, and am calmer now. Maybe there will be pictures of said sweater in the future. 

Today, I resorted my priorities and went back to the TKGA masters sweater. I decided upon a schedule - work the sleeves in October, the body in November and December. January will be finishing and reviewing my written work.  


I am a few rows from finishing the first sleeve repeat and I'm pretty happy. I remeasured gauge and needed to tweak some numbers, but not so much that ripping or a major rewrite was involved. 

Then I made Chap Jae for Neighbors night out.